WIND PROJECTS IN MIDDLESEX & LAMBTON COUNTIES

Below is a Map of all the registered projects in Middlesex and Lambton Counties (more are in the works that we do not know about yet: Please let us know of any new projects).

2013 MLWAG map

View – Wind Projects- Middlesex & Lambton Counties 2010 in a larger map


—————————————————————-
Adelaide Wind Project (Adelaide/Kerwood)
Nextera (formerly TCI Renewables)
60000 kW (38 Wind Turbines)
Status: OPA agreement granted
More Information on the Adelaide Wind Proposal here…….
—————————————————————
Bornish Wind Energy Centre (Arkona/Parkhill)
NextEra (FPL)
73500 kW (45 Wind Turbines)
Status: OPA agreement granted
More Information on the Bornish Wind Proposal here…….
—————————————————————–
Jericho Wind Energy Centre (Thedford, Forest, Arkona, Lambtonn Shores)
NextEra FPL
150000 kW (92 Wind Turbines)
Status: OPA agreement granted
More information on Jericho Wind Proposal here…
—————————————————————-
Adelaide Wind Power Project (Adelaide/Strathroy)
Suncor Energy Products Inc.
40000 kW (30WT’s)
Status: OPA agreement granted
More information on Suncor Adelaide Project…
—————————————————————-
Napier Wind Farm (Kerwood)
wpd Canada Corp. (has purchased some of IPC’s projects)
5400 kW (2 Wind Turbines)
Status: OPA agreement granted
More inforkation on Napier Wind Project…
—————————————————————-
Brooke-Alvinston Zephyr Wind Farm (Watford, Brooke-Alvinston)
Green Breeze Energy Inc (Oneworld)
 — sold to Schneider Power
10000 kW (4 – 2.3MW WT’s )
Status: OPA agreement granted – REA approved – being appealed.
—————————————————————-
ShilohWind Farm (Brooke, Alvinston)
wpd Canada Corp
46000 kW  (~30 WT’s)
Status: Awaiting ECT
—————————————————————-
Sydenham Wind Energy Centre (Florence)
Mainstream Sydenham Renewable Power Inc
66700 kW  (~44WT’s)
Status: Awaiting ECT
—————————————————————-
Lucan Maximum Breeze (Lucan)
Maximum Breeze Energy Co-operative
10000 kW (~6 WT’s)
Status: Awaiting ECT
—————————————————————-
Strathroy A, B & C Wind Project (Kerwood and Caradoc)
NextEra (FPL)
18 Wind Turbines
Status: No progress yet.
—————————————————————-
Parkhill Wind Farm (Parkhill/Arkona)
Canadian Hydro
30-70MW(~25 Wind turbines)
Status: No progress yet.
More Information on the Parkhill Wind Proposal here…….
—————————————————————-

Here is a map of what the OPA originaly thought they would like to see in Transmission Expansion (but this has changed).

Transmission expansion: click map to see details.

Transmission expansion: click map to see details.

#6 London Area to Sarnia
“There is a significant amount of existing generation located in the area West of London, including gas, wind, solar and coal. There is also significant interest in additional wind generation development in the area. The inter-tie with Michigan is located here as well. Reinforcement of the transmission system west of London would be required to enable the incorporation of the new renewable generation.”

#10 Huron South Enabler
“One of a number of enabling transmission lines identified for areas throughout the province. These lines will be constructed in areas where there is sufficient developer interest in shared connection facilities and will help to enable an even greater amount of renewable generation.”

#20 London-Hamilton Area
“As higher levels of renewable generation development occur in the area west of London, the transfer of power from London toward the GTA will increase. When this transfer reaches the capability of the existing transmission system between London and Hamilton, renewable generation development will be limited. New transmission between London and Hamilton would alleviate this restriction and allow for further renewable generation development in London and western Ontario.”